for North Sydney Office Building Lobby
The owners of an office building needed to update and renovate the lift lobby floor which comprised a mix of ceramic tiles, old terrazzo & carpet.
A polished concrete type finish was specified but because the offices were operational the building couldn't be closed down & a new slab installed. The cost and logistics of removing the terrazzo & tiles also posed an expensive problem.
Concrete Artisans came up with a cost effective solution where all works could be done out of working hours. The following Friday night after the Ardex K15 system had been installed Concrete Artisans 5mm thick ICF System Number 4 was applied over the top. After a day of curing the ICF was polished & sealed on the Sunday & handed back to client on Monday morning without causing any disruption to the businesses in the building.
Watch the Installation Video Now
|